The structure of the project adopts the reverse Fink truss structure, and the total length of the bridge is 181.8 meters, the main span length of 150 meters, the bridge width of 8 meters, after completion will be the world's largest single-span reverse Fink type bridge, with a total steel volume of 1,768 tons。
07 Provincial highway across the Hangpingshen Line channel (restricted Class III) bridge, the main bridge adopts 41+90+41m three-span underbearing steel truss arch bridge structure。The weight of the single main bridge steel structure is 4333.5 tons, single approach bridge steel structure 36.0 tons, total bridge 8810.8吨。
The project is divided into two parts: the Ring Capital Separation Interchange and Guangming West Road Separation Interchange,There are four pairs of steel box beams,The total amount of steel used is 10,000 tons,Among them, the left side of the sixth link of the Ring capital separation interchange is a split three-box continuous steel box girder,The right panel is a four-box continuous steel box,Span layout is 58+58=116m,Top span deep speed,The total weight is approximately 1293 tons on the left,Right panel 1663 tons。Guangming West Road separation Interchange No. 2 joint single...
0572-8251967
Email: zjsrsz@163.com
Add: No.118 Hengtangqiao Road, Zhongguan Town, Deqing County, Huzhou City, Zhejiang Province
Scan and follow the wechat public platform
Technical support:Wanqi network
Copyright ©2019 Zhejiang Jushi Bridge Steel Structure Co., LTD. All Rights Reserved. Zhejiang ICP No. 2023008720-1
Zhejiang Jushi bridge steel structure Co., LTD